§ 114.055 CONSTRUCTION OF SPUR TRACK ON UNPAVED STREET; REQUIREMENTS UPON PAVING.
   A city street which is not paved at the time the spur track is constructed, or the portion of a paved city street which is not paved at the time the spur track is constructed, shall be constructed in accordance with General Order No. 72, Standard No. 1 of the Public Utilities Commission of the state. If the city street thereafter is paved or if the pavement thereafter is widened, the grantee, within 90 days after being notified by the Director of Public Works, shall reconstruct that portion of the street crossing within the newly paved portion to conform to that specified for paved portion of streets.
('64 Code, § 10-49) (Ord. 168, passed 2-9-61) Penalty, see § 10.97