§ 150.024 MOVER REQUIRED TO COMPLETE CLEANUP OPERATIONS; USE OF DEPOSIT TO PAY CITY TO COMPLETE CLEANING.
   Within 14 days after any building or structure has been moved, the permittee shall complete all cleanup operations as required by the Director of Public Works upon the site from which the building or structure has been moved. Such operations shall include, but shall not be limited to, the removal of all rubbish and materials from the site, the filling of all excavations to existing grade and such additional work as may be necessary to leave the premises in a safe and sanitary condition. In the event that the cleanup operations are not completed within such 14-day period, the city shall cause to be done all necessary work to complete such cleanup operations and the cost thereof shall be deducted from the deposit as required by this subchapter.
('64 Code, § 5-9) (Ord. 185, passed 10-12-61) Penalty, see § 10.97