The purpose of the Flood Plain Overlay zone is to protect public health, safety, and general welfare, and to minimize hazards due to flooding in specific areas as identified by the latest adopted Flood Insurance Rate Maps, in addition to the following:
(Ord. MC-1393, 12-02-13)
1. To minimize expenditure of public money for costly flood control projects;
2. To minimize the need for the rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
3. To minimize prolonged business interruption;
4. To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazard;
5. To help maintain a stable tax base by providing for the second use and development of area of special flood hazard so as to minimize future flood blight areas;
6. To ensure that potential buyers are notified that property is in an area of special flood hazard; and
7. To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions.
In order to accomplish its purposes, this Chapter includes methods and provisions for:
1. Restricting or prohibiting uses which are dangerous to health, safety, and property due to water or erosion hazards, or which result in damaging increases in erosion of flood heights or velocities;
2. Requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;
3. Controlling the alteration of natural floodplains, stream channels, and natural protective barriers, which help accommodate or channel flood waters;
4. Controlling filling, grading, dredging, and other development which may increase flood damage; and
5. Preventing or regulating the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards in other areas.