The Department shall be notified at least twenty-four hours in advance to make an inspection of the following operations:
A. Prior to the sealing of the annular space or filing of the conductor casing;
B. After installation of the surface protective slab and pumping equipment;
C. During destruction of all wells, after the well has been sealed as per the approved plans;
D. Any other operation which might be stipulated on the permit by the Director to cope with special or unusual conditions.
(Ord. 3475, 1-22-75)