Table 83-9 identifies the infrastructure improvements required for all new residential and nonresidential subdivisions and non-residential development in the Valley Region.
Standards | Residential and Agricultural Land Uses (Lot sizes are the size of the resultant parcels after subdivision) | Commercial and Institutional Land Uses | Industrial Land Uses | ||
1 acre or less | More than 1 to less than 2.5 acres | 2.5 acres or greater | All lot sizes | All lot sizes | |
Y = Yes NA = Not Allowed N = Not required |
Standards | Residential and Agricultural Land Uses (Lot sizes are the size of the resultant parcels after subdivision) | Commercial and Institutional Land Uses | Industrial Land Uses | ||
1 acre or less | More than 1 to less than 2.5 acres | 2.5 acres or greater | All lot sizes | All lot sizes | |
Y = Yes NA = Not Allowed N = Not required | |||||
Legal and physical access | Y | Y | Y | Y | Y |
Grants of Easements(1)(9) | Y | Y | Y | Y | Y |
Paved Access(9) | |||||
Internal access (internal roads) | Y | Y | Y | Y | Y |
Perimeter access (road abutting subject property) | Y | Y | Y | Y | Y |
Off-site access (paving to nearest paved road) | Y | Y | Y | Y | Y |
Curbs and gutters(2)(9) | Y | Y | Y(3) | Y | Y |
Sidewalks(2)(9) | Y (2 sides) | Y(4) (1 side) | N | Y | Y |
Street lights | |||||
Standard spacing including intersections | Y | N | N | Y | Y |
Intersections only | N | N | Y | N | N |
Water | |||||
Water purveyor(5) | Y | Y | Y or Y(6) | Y | Y |
Substantiated water well | NA | NA | N | N | |
Sanitation | |||||
Sewer(7) | Y or Y | Y or Y | Y or Y | Y | Y |
Septic systems
(8) | N | N | |||
Drainage improvements(9) | Y | Y | Y | Y | Y |
Fireflow | Y | Y | Y | Y | Y |
Notes: | |||||
(1) Necessary rights-of way for transportation and circulation, drainage and flood control facilities, and utilities included. | |||||
(2) These requirements may be waived within infill areas where there is no plan or financing mechanism in place to provide such improvements to other existing properties and where, as a result, such improvements will not be connected to other infrastructure. | |||||
(3) The Public Works Department shall require curbs and gutters, if necessary, to control vehicle access and street drainage. May be required by Caltrans on State highways. | |||||
(4) Sidewalks may be required on both sides of the street by the Public Works Department if needed for pedestrian safety. | |||||
(5) Projects shall connect to a water purveyor when the nearest property line is within 200 ft. of a water line. This requirement shall be increased by 100 ft. for each dwelling unit in the project. | |||||
(6) Individual well allowed if no water purveyor is available and when consistent with Water Master requirements in adjudicated groundwater basins. | |||||
(7) Sewers shall be required within established sewer service districts and outside such districts when required by the WQCB. Projects shall connect to a sewer system when the nearest property line is within 200 ft. of a sewer line. This requirement shall be increased by 100 ft. for each dwelling unit in the project. | |||||
(8) Septic systems are allowed only if the subject parcel is larger than one-half acre or meets WQCB requirements. | |||||
(9) Waivers or modifications to these requirements may be considered pursuant to § 83.05.070 of this Code. | |||||
(Ord. 4011, passed - -2007; Am. Ord. 4242, passed - -2014)