§ 19.17.015 GRADING INSPECTION.
   (A)   All grading operations for which a permit is required shall be subject to inspection by the county. When required by the county, special testing shall be performed by the applicants at their expense. The permittee, or his or her agent, shall notify the county when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage facilities, and their protective devices and all erosion control measures have been completed in accordance with the final approved grading plan and the required reports have been submitted. The required bonding, cash deposit or letter of credit may be released after the county grants a final approval.
   (B)   All grading and drainage, subject to §§ 19.17.009 and 19.17.011 of this chapter, shall be inspected during construction by the County Engineer.
   (C)   All grading and drainage, subject to §§ 19.17.009, 19.17.011 and 19.17.015 of this chapter, shall be subject to public works fees as structured and set forth in Chapter 19.13 of the San Benito County Code.
(1966 Code, § 7A-15) (Ord. 708, § 1; Ord. 801, § 1(X))