The final plat shall contain the following information:
(A) Name of the subdivision, location by section, range, and township, or by VMS number; date, north point, scale, and acreage;
(B) Names and addresses of the subdivider, and the qualified engineer and/or surveyor who prepared the final plat;
(C) Plat boundaries, based on accurate traverse, with angular and lineal dimensions. The survey must close;
(D) Bearings and distances to nearest established street lines or other recognized permanent monuments;
(E) Exact locations, rights-of-way, and pavement widths, and names of all streets within and adjoining the plat building setback lines;
(F) Radii, internal angles, points of curvature, tangent bearings, lengths of arcs, and lengths and bearings of chords;
(G) All easements and rights-of-way provided for public services or utilities;
(H) All lot numbers and lines with accurate dimensions in feet and hundredths;
(I) Accurate location and description of all monuments;
(J) Accurate outlines of areas to dedicated or reserved for public use, or any area to be reserved for common uses of all property owners;
(K) A list of any restrictions and covenants the subdivider intends to include in the deeds to the lots in the subdivision;
(L) Certification by a registered surveyor to the effect that the plat represents a survey made by him or her, and that the monuments shown thereon exist as located, and that all dimensional details are correct; and
(M) Notarized certification by the owner or owners of the adoption of the plat, and the dedication of streets and their public areas.
(Ord. 367, passed 8-27-1973)