The following survey data and information shall be shown on each final map or parcel map for which a field survey was made pursuant to the provisions of these regulations:
A. The basis of bearing used in the field survey, making reference to a recorded final map, parcel map or other record acceptable to the director of public works;
B. Stakes, monuments (together with their precise position), or other evidence found on the ground to determine the boundaries of the subdivision;
C. Corners of all adjoining properties identified by lot and block numbers, subdivision names, numbers and page of record or by section, township and range or other proper designation;
D. All information and data necessary to locate and retrace any point or line without unreasonable difficulty;
E. The location and description of any required monuments to be set after recordation of the final map, and the statement that they are "to be set";
F. Bearing and length of each lot line, block line and boundary line and each required bearing and distance;
G. Chord length, chord bearing, and radius of each curve or as required by the director of public works; and
H. The center line and width of any street or alley in or adjoining the subdivisions.
The form, layout, scale and other particulars of the map shall be consistent with any required improvement plans, and shall be in accordance with the requirements of the director of public works. (Ord. 2017-0009 § 28)