A. All abandoned driveways shall be removed by the lot owner within 60 days of the abandonment or within 45 days from the time the city traffic engineer gives the lot owner written notice, whichever occurs first.
B. All driveway removals shall be the responsibility of the lot owner, and all work shall be done at the owner's expense. Work in the public right-of-way shall be in accordance with the city standard specifications in effect at the time the permit is issued. (Ord. 2017-0009 § 13)