17.220.730   M-T zone-Setbacks.
   A.   Front-yard setback. There is no minimum front-yard setback.
   B.   Street side-yard setback. There is no minimum street side-yard setback.
   C.   Interior side-yard setback.
      1.   Unless paragraph 2 of this subsection applies, there is no minimum interior side-yard setback.
      2.   If the interior side-yard lot line abuts the side of an R- or OB-zoned lot and is not separated by an alley, the minimum side-yard setback is 5 feet.
   D.   Rear-yard setback.
      1.   Unless paragraph 2 of this subsection applies, no minimum rear-yard setback is required.
      2.   If the rear lot line abuts the side of an R- or OB-zoned lot and is not separated by an alley, the minimum rear-yard setback is 15 feet.
   E.   Levee setback. A minimum 20-foot setback from the landside toe of any flood control levee is required for development less than 5 acres in size. A minimum 50-foot setback is required from the landside toe of any flood control levee for development 5 acres or greater in size. No primary or accessory structures may encroach into the levee setback. (Ord. 2020-0006 § 5)