A. Front setback. The minimum front-yard setback is 25 feet.
B. Street side-yard setback. The minimum street side-yard setback is 25 feet.
C. Interior side-yard setback.
1. Unless the provisions of paragraph 2 of this subsection apply, no minimum interior side-yard setback is required.
2. If the interior side-yard lot line abuts the side of an R- or OB-zoned lot and is not separated by an alley, the minimum side-yard setback is five feet.
D. Rear-yard setback.
1. Unless paragraph 2 of this subsection applies, no minimum rear-yard setback is required.
2. If the rear lot line abuts the side of an R- or OB-zoned lot and is not separated by an alley, the minimum rear-yard setback is 15 feet.
E. Levee setback. A minimum 20-foot setback from the landside toe of any flood control levee is required for development less than five acres in size. A minimum 50-foot setback is required from the landside toe of any flood control levee for development five acres or greater in size. No primary or accessory structures may encroach into the levee setback. (Ord. 2013-0020 § 1; Ord. 2013-0007 § 1)