A. Front setback. There is no minimum front-yard setback.
B. Street side-yard setback. There is no minimum street side-yard setback.
C. Interior side-yard setback.
1. Unless paragraph 2 of this subsection applies, there is no minimum interior side-yard setback.
2. If the interior side-yard lot line abuts the side of an R- or OB-zoned lot and is not separated by an alley, the minimum side-yard setback is five feet.
D. Rear-yard setback.
1. Unless paragraph 2 of this subsection applies, no minimum rear-yard setback is required.
2. If the rear lot line abuts the side of an R- or OB-zoned lot and is not separated by an alley, the minimum rear-yard setback is 15 feet.
E. Levee setback. A minimum 20-foot setback from the landside toe of any flood control levee is required for development less than five acres in size. A minimum 50-foot setback is required from the landside toe of any flood control levee for development five acres or greater in size. No primary or accessory structures may encroach into the levee setback. (Ord. 2013-0020 § 1; Ord. 2013-0007 § 1)