A. Front-yard setback. There is no minimum or maximum front-yard setback.
B. Street side-yard setback. There is no minimum or maximum street side-yard setback.
C. Interior side-yard setback.
1. Unless paragraph 2 of this subsection applies, the minimum interior side-yard setback is five feet.
2. If the interior side-yard lot line abuts a public alley, no minimum interior side-yard setback is required.
D. Rear-yard setback.
1. Unless paragraph 2 of this subsection applies, the minimum rear-yard setback is 15 feet.
2. If the rear-yard lot line abuts a public alley, the minimum rear-yard setback is five feet.
E. Levee setback. A minimum 20-foot setback from the landside toe of any flood control levee is required for development less than five acres in size. A minimum 50-foot setback is required from the landside toe of any flood control levee for development five acres or greater in size. No primary or accessory structures may encroach into the levee setback. (Ord. 2017-0061 § 40; Ord. 2013-0020 § 1; Ord. 2013-0007 § 1)