A. Front and street side-yard setbacks. The minimum front and street side-yard setbacks are 20 feet.
B. Rear-yard setback.
1. Unless paragraph 2 of this subsection applies, there is no minimum rear-yard setback.
2. If the rear-yard lot line is adjacent to an R- or OB-zoned lot and is not separated by an alley, the minimum rear-yard setback is 15 feet.
C. Interior side-yard setback.
1. Unless paragraph 2 of this subsection applies, there is no minimum interior side-yard setback.
2. If the interior side-yard lot line is adjacent to an R- or OB-zoned lot and is not separated by an alley, the minimum interior side-yard setback is five feet.
D. Levee setback. A minimum 20-foot setback from the landside toe of any flood control levee is required for development less than five acres in size. A minimum 50-foot setback is required from the landside toe of any flood control levee for development five acres or greater in size. No primary or accessory structures may encroach into the levee setback. (Ord. 2013-0020 § 1; Ord. 2013-0007 § 1)