15.100.710   Sizing.
   The standby and emergency power generating system(s) shall be of ample capacity to provide full power to all required loads at the same time. There shall be no load diversities permitted. Possible future tenant improvement loads shall also be included.
   A.   Load demands shall be figured at one hundred twenty-five (125) percent of all required elevator motors (one each bank);
   B.   One hundred twenty-five (125) percent of the largest required motor load;
   C.   One hundred twenty-five (125) percent of all lighting load and one hundred (100) percent of all other required loads. (Prior code §§ 9.28.1270, 15.15.1505)