CERTIFICATE OF COMPLETION
This certificate is filled out by the project applicant upon completion of the landscape project.
PART 1. PROJECT INFORMATION SHEET
Date | ||
Project Name | ||
Name of Project Applicant | Telephone No. | |
Fax No. | ||
Title | Email Address | |
Company | Street Address | |
City | State | Zip Code |
Project Address and Location:
Street Address | Parcel, tract or lot number, if available. | |
City | Latitude/Longitude (optional) | |
State | Zip Code |
Property Owner or Designee:
Name | Telephone No. | |
Fax No. | ||
Title | Email Address | |
Company | Street Address | |
City | State | Zip Code |
Property Owner
"I/we certify that I/we have received copies of all the documents within the Landscape Documentation Package and the Certificate of Completion and that it is our responsibility to see that the project is maintained in accordance with the Landscape and Irrigation Maintenance Schedule."
Property Owner Signature Date
Please answer the questions below:
1. Date the Landscape Documentation Package was submitted to the City _____________.
2. Date the Landscape Documentation Package was approved by the City _____________.
3. Date that a copy of the Water Efficient Landscape Worksheet (including the Water Budget Calculation) was submitted to the local water purveyor _____________.
PART 2. CERTIFICATION OF INSTALLATION ACCORDING TO THE LANDSCAPE DOCUMENTATION PACKAGE
"I/we certify that based upon periodic site observations, the work has been completed in accordance with Chapter 15.92 of the Sacramento City Code and that the landscape planting and irrigation installation conform with the criteria and specifications of the approved Landscape Documentation Package."
Signature* | Date | |
Name (print) | Telephone No. | |
Fax No. | ||
Title | Email Address | |
License No. or Certification No. | ||
Company | Street Address | |
City | State | Zip Code |
*Signer of the landscape design plan, signer of the irrigation plan, or a licensed landscape contractor.
PART 3. IRRIGATION SCHEDULING
Attach parameters for setting the irrigation schedule on controller per Section 15.92.140 of the Sacramento City Code.
PART 4. SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE
Attach schedule of landscape and irrigation maintenance per Section 15.92.150 of the Sacramento City Code.
PART 5. LANDSCAPE IRRIGATION AUDIT REPORT
Attach landscape irrigation audit report per Section 15.92.160 of the Sacramento City Code.
PART 6. SOIL MANAGEMENT REPORT
Attach soil analysis report, if not previously submitted with the landscape documentation package per Section 15.92.090 of the Sacramento City Code.
Attach documentation verifying implementation of recommendations from soil analysis report per Section 15.92.090 of the Sacramento City Code.
(Ord. 2015-0038 § 2)