15.92.130   Certificate of completion.
   A.   A certificate of completion in substantial conformance with Appendix C shall include the following six elements:
      1.   Project information sheet that contains:
         a.   Date,
         b.   Project name,
         c.   Project applicant name, telephone, and mailing address,
         d.   Project address and location, and
         e.   Property owner name, telephone, and mailing address;
      2.   Certification by either the signer of the landscape design plan, the signer of the irrigation design plan, or the licensed landscape contractor that the landscape project has been installed per the approved landscape documentation package;
         a.   Where there have been significant changes made in the field during construction, these "as-built" or record drawings shall be included with the certification,
         b.   A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes;
      3.   The irrigation scheduling parameters used to set the controller (see Section 15.92.140);
      4.   The landscape and irrigation maintenance schedule (see Section 15.92.150);
      5.   The irrigation audit report (see Section 15.92.160); and
      6.   The soil analysis report (if not submitted with the landscape documentation package) and documentation verifying implementation of soil report recommendations (see Section 15.92.090).
   B.   The project applicant shall:
      1.   Submit the signed certificate of completion to the city for review; and
      2.   Ensure that copies of the approved certificate of completion are submitted to the local water purveyor and property owner or designee.
   C.   The director shall approve or deny the certificate of completion. If the certificate of completion is denied, the director shall provide information to the project applicant regarding reapplication, appeal, or other assistance. (Ord. 2015-0038 § 2)