15.92.060   Landscape documentation package-Submittal-Action by director.
   A.   Prior to construction of a landscape project, the project applicant shall submit a completed landscape documentation package to the director.
   B.   Prior to construction of a landscape project, the director shall:
      1.   Provide the project applicant with the procedures for permits, plan checks, plan reviews, or design reviews;
      2.   Review the landscape documentation package submitted by the project applicant;
      3.   Approve or deny the landscape documentation package;
      4.   Issue a permit or approve the plan check, plan review, or design review for the project applicant; and
      5.   Upon approval of the landscape documentation package, submit a copy of the water efficient landscape worksheet to the local water purveyor.
   C.   Upon approval of the landscape documentation package by the director, the project applicant shall:
      1.   Receive a permit or approval of the plan check, plan review, or design review and record the date of the permit in the certificate of completion;
      2.   Submit a copy of the approved landscape documentation package along with the record drawings, and any other information to the property owner or designee; and
      3.   Submit a copy of the water efficient landscape worksheet to the local water purveyor. (Ord. 2015-0038 § 2)