An ESC plan shall be prepared for all projects to control surface runoff and erosion and to retain sediment on a particular site and prevent pollution of site runoff during the period beginning when any preconstruction- or construction-related grading or soil storage first occurs, until all final improvements and permanent structures are complete. The ESC plan shall be prepared and submitted concurrently with the final grading plan. The ESC plan may be incorporated on the same plan sheet as the final grading plan unless it makes the sheet cluttered, or it may be submitted on a clean separate sheet. The separate sheet shall be drawn clearly and legibly and entitled "erosion and sediment control plan," shall contain a statement of the purpose of the proposed best management practices to be used, and shall include all of the information required and contained in the Manual of Standards, Chapter 2, Section 3. (Ord. 2003-058 § 3; prior code § 9.33.1704)