13.08.170   Required connection to city sewer system.
   If any property in the city containing any building or structure is used for human occupancy, employment, recreation or similar human use abuts a city street, alley or utility easement in which there is located a city sewer main within two hundred (200) feet of the building or structure, but the building or structure is not connected to the city sewer system, the director may require that the building or structure be connected to the city sewer system, if the director determines that the connection would alleviate a potential health hazard or otherwise promote the public health, welfare or safety. If required by the director, the owner shall install, at the owner's expense, a connection to the city sewer system, including an extension of the main if necessary to do so, in accordance with the requirements of this chapter. (Ord. 2005-020 § 2)