§ 7-3-29 EXTENDING WATER MAINLINES.
   (A)   The full cost of mainline extensions, including engineering, materials and labor shall be borne by the developer as the applicant for service.
   (B)   The PWD has the authority to make arrangements with equipment operators, contractors and plumbers to accomplish the work, unless the total cost is such that formal bidding procedures are required.
   (C)   No water shall be turned on until the fees for extension and hook-up are paid in full.
(1992 Code, § 7-1-1135) (Ord. 06-01, passed 11-6-2006)