§ 160.063 STOCKPILES.
   Stockpiles of soil and other erodable or floatable building materials (sand, limestone, etc.) shall not be located in floodplains, overflow routes or areas subject to frequent inundation. If a stockpile is to remain in place for more than three days, then sediment and erosion control shall be provided for the stockpile.
(Ord. 06-0383, passed 3-15-06)