§ 160.057 GENERAL REQUIREMENTS.
   (A)   The runoff from disturbed areas shall not leave the development site without first passing through sediment control facilities. This requirement shall apply to all phases of construction and shall include an ongoing process of implementation of measures and maintenance of those measures during both the construction season and any construction shut down periods.
   (B)   The smallest practical area shall be exposed for the shortest practical time during development. However, in no case shall more than 20 acres be exposed at one time on a development unless a larger area is approved by the Administrator.
   (C)   All applicants for developments of one acre or more shall submit an application for an NPDES permit or a Notice of Intent (NOI) to be covered under a general NPDES permit. A copy of any Stormwater Pollution Prevention Plan (SWPPP) required by such permit shall be provided to the village prior to commencement of development activities and a copy shall be kept on the development site at all times.
(Ord. 06-0383, passed 3-15-06)