§ 51.18 PERMIT REQUIRED; CLASSES OF PERMITS.
   (A)   No unauthorized person shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Clerk Treasurer.
   (B)   (1)   There shall be two classes of building sewer permits:
         (a)   Residential users; and
         (b)   Commercial/non-residential users.
      (2)   In either case, the owner or his or her agent shall make application on a special form furnished by the city. The permit application shall be supplemented by any plans, specifications or other information considered pertinent in the judgment of the Inspector. Connections fees will be as defined by a separate ordinance.
   (C)   All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall be responsible for the building sewer from the point of tap to the city line. The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
   (D)   A separate and independent building sewer shall be provided for every building; except where one building stands at the rear of another or an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, courtyard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer.
   (E)   Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the Inspector, to meet all requirements of this subchapter.
   (F)   The size, slope, alignment, materials of construction of a new building sewer and the methods to be used in excavating, placing of the pipe, jointly testing and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
   (G)   Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewer carried by such building drain shall be lifted by an approved means and discharged to the building sewer.
   (H)   No person shall make connection of roof downspouts, exterior foundation drains, areaway drains or other sources of surface run-off ground water to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer.
   (I)   The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city, or the procedures set forth in appropriate specifications of the A.S.T.M. and the W.P.C.F. Manual of Practice No.9. All such connections shall be made gas tight and water tight. Any deviation from the prescribed procedures and materials must be approved by the Superintendent before installation.
   (J)   The applicant for the building sewer permit shall notify the Inspector when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the Inspector or his or her representative.
   (K)   All excavations for building installation must be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city.
(Ord. 15-2021, passed 11-23-21)