4-2-1: BUILDING PERMIT FEES:
   A.   Payment Of Fees: No permit as required by this code shall be issued until the fee prescribed herein shall have been paid; nor shall an amendment to a permit be approved until the additional fee, if any, due to an increase in the estimated cost of the building or structure, shall have been paid.
   B.   Construction Or Alteration: For a permit for the construction or alteration of a building or structure, the fee shall be at the rate of twenty dollars per one thousand dollars of the estimated cost for single-family residential construction and twenty three dollars fifty cents per one thousand dollars of the estimated cost for all other types of construction. The minimum fee shall be one hundred dollars. The duration of permit for single-family construction shall be fifteen months and twelve months for all other types of construction except that the duration of a permit for a project approved as a site plan review or planned development shall be in accordance with the approved schedule of development contained within the site plan review or planned development application.
   Extensions to the permit may be granted in accordance with the following:
   1/3 of the original fee for the first 3 month extension for single-family residential construction, and 100% of the original fee for the first 3 month extension for all other types of construction.
   1/3 of the original fee for the second 3 month extension for single-family residential construction, and 100% of the original fee for the second 3 month extension for all other types of construction.
   The permit holder shall receive a rebate prorated per diem for the extension fee in the event the work covered by the permit is completed in less time than the maximum allowed. The project shall be considered completed upon approval of all required final inspections and restoration, if required, of any public right of way.
   C.   Additional Permits: In addition to other permit requirements of this code, permits and fees shall be required for:
Permit/Certificate
  Fee
Permit/Certificate
  Fee
Certificate of occupancy
$ 50.00
Gutter work
100.00
Paving
100.00
Placard removal: Unfit for occupancy
500.00
Removal of stop work order
200.00
Roofing
100.00
Siding
100.00
Temporary certificate of occupancy
50.00
 
   D.   Reinspection Fee: There shall be a reinspection fee of seventy five dollars for each additional inspection due to failure to complete the work by the time of the scheduled inspection or due to a failed inspection.
   E.   Plan Review Fee: In addition to the building permit fee, a plan review fee may be imposed to defray the costs of contracting with independent professionals to review permit applications for compliance with applicable building codes.
   F.   Demolition Fees: The fee for a permit for the demolition of a building or structure shall be at the rate of one dollar per square foot of floor area with a minimum fee of two hundred dollars for accessory structures or one thousand five hundred dollars for primary structures.
   G.   Temporary Permits: A temporary permit shall be required for the overnight placement or storage of the following on private property: construction equipment, construction vehicles, construction trailers, portable toilets, portable storage containers and dumpsters. An application for a permit shall be made to the director of public works. The application shall describe the nature, location, type of equipment and duration of time on site, as well as, details of any applicable protection. The fee for such permit shall be fifty dollars for the first month or fraction thereof and fifty dollars per month thereafter except that the fee for portable toilets stored in a front yard shall be one hundred dollars per month. (Ord. 3447, 7-9-2012; amd. Ord. 3872, 9-12-2022)