CHAPTER 1346
Post-Construction Water Quality Runoff Control
 
 
1346.01   Creation of chapter.
1346.02   Purpose.
1346.03   Disclaimer of liability.
1346.04   Conflicts, severability, nuisances and responsibility.
1346.05   Effective date.
1346.06   Scope.
1346.07   Consultations.
1346.08   Post-construction Water Quality Control Plan.
1346.09   Easements.
1346.10   Maintenance.
1346.11   Minimum standards.
1346.12   Redevelopment projects.
1346.13   Alternative actions.
1346.14   Compliance with other rules and regulations.
1346.15   Violations.
1346.16   Construction and maintenance guarantee.
1346.17   Application procedures for post-construction water quality plans.
1346.18   Definitions.
1346.99   Penalties.
 
 
CROSS REFERENCES
      Control of construction site soil erosion, sediment and other wastes
         and storm water runoff - see BLDG. Ch. 1344
      Riparian setbacks - see BLDG. Ch. 1345
 
 
 
 
1346.01 CREATION OF CHAPTER.
   Council hereby creates Chapter 1346 of the Codified Ordinances of the City of Reminderville which shall read as follows.
   (a)   COMMUNITY: Throughout this regulation the Community shall mean the City of Reminderville, State of Ohio, and its designated agents and representatives.
   (b)   COMPREHENSIVE STORM WATER MANAGEMENT PLAN: The Post-Construction Water Quality Plan developed to meet this regulation will be coordinated and combined with the Riparian and Wetland Setback Plan and the Construction Site Conservation Plan that are developed for the same site. These plans will be titled and numbered in one consecutive sequence to make a Comprehensive Storm Water Management Plan for the site. The Comprehensive Storm Water Management Plan so developed will serve as the Storm Water Pollution Prevention Plan (SWP3) required by Ohio EPA as part ofthe NPDES Storm Water Permit for General Construction.
      (Ord. 14-2013. Passed 3-12-13.)
 
Loading...