A. Slope Analysis; Slope Plan: A building site slope analysis and a slope plan certified by a registered civil engineer shall be submitted to the community development department for review and approval of conformance with this chapter prior to any clearing, grading or the issuance of a building permit or grading permit.
B. Cut And Fill Requirements:
1. No cut or fill shall encroach upon any federal emergency management agency (FEMA) floodplain except in conformance with city and FEMA regulations.
2. Cut or fill material in excess of that approved for use shall be disposed of in a manner approved by the city engineer or his designated representative.
3. Cut or fill materials that are added to or taken away from the site shall be transported according to a haul route approved by the city engineer or his designated alternative.
C. Erosion And Sediment Control: Erosion and sediment control shall be accomplished according to best management practices defined in Redlands southeast general plan amendment final environmental impact report sch. #87070606, appendix 5.
D. Slope Landforming:
1. Landforming shall be accomplished by the use of variable slope ratios, undulating tops and toes, hiding of terraces and downdrains, and constantly varying surface features and landscaping.
2. All slopes greater than one hundred feet (100') in length or ten feet (10') and greater in height shall be landformed.
3. Slopes constructed adjacent to roadways shall be designed to reduce their visual impacts, by the use of variable slope ratios, meandering tops and toes, and integrated landscaping with right of way areas. (Ord. 2687 § 1, 2008)