§ 54.05 CONSTRUCTION REQUIREMENTS.
   Every individual sewage disposal system installed after the effective date of this chapter and every alteration, extension and repair to any system made after that date shall conform to the standards of the code adopted by reference in § 54.02.
(2009 Code, § 404.05)