[Amended 2-14-2011 by Ord. No. 8-2011]
A. Wastewater treatment operations. An application for a wastewater treatment operation shall include a general explanation of the treatment processes, including the technologies involved, noise and odor-mitigating measures, and the receiving water body of the treated effluent. The area of wastewater treatment equipment which is open to precipitation from above need not be counted in the calculation of building and impervious coverage percentages.
B. Law enforcement operations. An application for a firing range shall include a description of the design of the berm/backstop, and other safety measures. Designs shall implement the Environmental Protection Agency's Best Management Practices (BMPs) for lead at firing ranges.
C. Fire and rescue service operations. An application for a live-fire training facility shall include a description of the different training structures/evolutions designed. Water towers, simulation buildings, and other buildings specifically designed for their height, may exceed the building height maximum, where such increased height is related to the instruction or practice of firefighting and/or rescue techniques.
D. Recycling operations. An application for a recycling operation shall include a description of the types and quantities of materials to be collected and the loading areas.