[Amended 7-27-2015 by Ord. No. 40-2015]
In computing the surface area of the permanent pavement restoration surface to be charged, for small single cuts, 12 inches shall be added to all sides of the proposed cut. For large street cuts [per § 508-707B(1)], the charged surface shall include the combined area of each trench plus, as a separate fee, the area of milling and overlay required to restore the overlying surface. For applicants where the large cuts are coordinated with the City for ahead of paving permits, see § 508-709C. If the permittee or City inspector determines that the permittee removed, disturbed or damaged a pavement area greater than what is stated on the permit, the permittee shall pay a proportionate amount to be fixed by the Department of Public Works.