§ 151.34 IDENTIFIED FLOODWAYS.
   (A)   Located within SFHAs, established in § 151.07, are areas designated as floodways. The floodway is an extremely hazardous area due to the velocity of floodwaters, which carry debris, potential projectiles, and has erosion potential.
   (B)   If the site is in an identified floodway, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to the Indiana Department of Natural Resources and apply for a permit for construction in a floodway.
   (C)   Under the provisions of I.C. 14-28-1 a permit for construction in a floodway from the Indiana Department of Natural Resources is required prior to the issuance of a local building permit for any excavation, deposit, construction or obstruction activity located in the floodway. This includes land preparation activities such as filling, grading, clearing and paving etc. undertaken before the actual start of construction of the structure. However, it does exclude non-substantial additions/improvements to existing (lawful) residences in a non-boundary river floodway. (I.C. 14-28-1-26 allows construction of non-substantial additions/improvements to residences in a non-boundary river floodway without obtaining a permit for construction in a floodway from the Indiana Department of Natural Resources. Please note that if fill is needed to elevate an addition above the existing grade, prior approval (construction in a floodway permit) for the fill is required from the Indiana Department of Natural Resources.)
   (D)   No action shall be taken by the Floodplain Administrator until a permit (when applicable) has been issued by the Indiana Department of Natural Resources granting approval for construction in a floodway.
   (E)   Once a permit for construction in a floodway has been issued by the Indiana Department of Natural Resources, the Floodplain Administrator may issue the local floodplain development permit, provided the provisions contained in §§ 151.30 through 151.36 have been met.
   (F)   The floodplain development permit cannot be less restrictive than the permit for construction in a floodway issued by the Indiana Department of Natural Resources. However, a community's more restrictive regulations (if any) shall take precedence.
   (G)   No development shall be allowed which acting alone or in combination with existing or future development, will increase the regulatory flood more than 0.14 of one foot; and
   (H)   For all projects involving channel modifications or fill (including levees) the town shall submit the data and request that the Federal Emergency Management Agency revise the regulatory flood data.
(Ord. 334, passed 7-16-07; Am. Ord. 393, passed 3-20-17)
§ 151.35 IDENTIFIED FRINGE.
   If the site is located in an identified fringe, then the Floodplain Administrator may issue the local floodplain development permit provided the provisions contained in §§ 151.30 through 151.36 have been met. The key provision is that the top of the lowest floor of any new or substantially improved structure shall be at or above the FPG.
(Ord. 334, passed 7-16-07; Am. Ord. 393, passed 3-20-17)
§ 151.36 SFHAS WITHOUT ESTABLISHED BASE FLOOD ELEVATION AND/OR FLOODWAYS/FRINGES.
   (A)   Drainage area upstream of the site is greater than one square mile:
      (1)   If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined, and the drainage area upstream of the site is greater than one square mile, the Floodplain Administrator shall require the applicant to forward the application, along with all pertinent plans and specifications, to the Indiana Department of Natural Resources for review and comment.
      (2)   No action shall be taken by the Floodplain Administrator until either a permit for construction in a floodway or a floodplain analysis/regulatory assessment citing the 100-year flood elevation and the recommended flood protection grade has been received from the Indiana Department of Natural Resources.
      (3)   Once the Floodplain Administrator has received the proper permit for construction in a floodway or floodplain analysis/regulatory assessment approving the proposed development, a floodplain development permit may be issued provided the conditions of the floodplain development permit are not less restrictive than the conditions received from the Indiana Department of Natural Resources and the provisions contained in §§ 151.30 through 151.36 have been met.
   (B)   Drainage area upstream of the site is less than one square mile:
      (1)   If the site is in an identified floodplain where the limits of the floodway and fringe have not yet been determined and the drainage area upstream of the site is less than one square mile, the Floodplain Administrator shall require the applicant to provide an engineering analysis showing the limits of the floodway, fringe and 100-year flood elevation for the site.
      (2)   Upon receipt, the Floodplain Administrator may issue the local floodplain development permit, provided the provisions contained in §§ 151.30 through 151.36 have been met.
   (C)   The total cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the regulatory flood more than 0.14 of one foot and will not increase flood damages or potential flood damages.
(Ord. 334, passed 7-16-07; Am. Ord. 393, passed 3-20-17)