Permit fees for moving buildings shall be as follows:
(a) Where a building of a size not exceeding 2,500 cubic feet is moved on vehicles over a public thoroughfare, and the total height above the ground when placed on such vehicles does not exceed fourteen feet, or a maximum width of ten feet - forty dollars ($40.00).
(b) Where a building is moved on or across a public thoroughfare, other than as provided for in subsection (a) and is of frame construction not over one story in height - one hundred dollars ($100.00); frame over one story in height - two hundred dollars ($200.00); any brick building - four hundred dollars ($400.00).
(c) Where a building is moved from one lot to another without moving on a public thoroughfare, the cost of moving shall be considered as an alteration cost and the fee shall be determined in accordance with Section 1305.05.
(d) Where a building is moved from one location on a lot to another location on the same lot, the cost of moving shall be considered an alteration cost, and the fee shall be determined in accordance with Section 1305.05.
(Ord. 1991-95. Passed 8-13-91.)