§ 152.13 AS-BUILT DRAWINGS.
   The engineer representing the subdivider shall present to the Director of Public Works, reproducible complete "as built plans" for all paving, drainage structures, water lines and sewer lines within 30 days after completion of each contract.
(Ord. 1252, passed 1-22-2004)