CHAPTER 17
STORMWATER MANAGEMENT
SECTION:
6-17-1: Authority, Purpose, And Objectives
6-17-2: Definitions
6-17-3: Applicability
6-17-3-1: Applicability For Stormwater Runoff Detention
6-17-3-2: Plan Submittal
6-17-3-3: Determination Of Property Area
6-17-4: Stormwater Management Plan
6-17-4-1: Minimization Of Increases In Runoff Volumes And Rates
6-17-4-2: Water Quality And Multiple Uses
6-17-4-3: Release Rates
6-17-4-4: Detention Basin Outlet Design
6-17-4-5: Maximum Bounce
6-17-4-6: Detention Storage Requirements
6-17-4-7: Drainage System Evaluation And Design
6-17-4-8: Methods For Generating Runoff Hydrographs
6-17-4-9: Wet Detention Basin Design
6-17-4-10: Wetland And Dry Detention Basin Design
6-17-4-11: Detention In Floodplains
6-17-4-12: Protection Of Wetlands And Depressional Storage Areas
6-17-4-13: Subsurface Drainage (Drain Tiles)
6-17-4-14: Extended Detention Basins
6-17-4-15: Street, Parking Lot, Culvert, And Property Drainage
6-17-4-16: Infiltration Practices
6-17-4-17: Safety Considerations
6-17-4-18: Maintenance Considerations
6-17-4-19: Natural Condition, Soils
6-17-4-20: Record Drawings
6-17-5: Flows From Upstream Tributary Areas
6-17-5-1: Upstream Areas Not Meeting Chapter Requirements
6-17-5-2: Upstream Areas Meeting Chapter Requirements
6-17-6: Administration
6-17-6-1: Early Completion Of Detention Facilities
6-17-6-2: Maintenance Responsibility
6-17-6-3: Inspections
6-17-6-4: Enforcement
6-17-6-5: Variances And Appeals
6-17-6-6: Severability
6-17-6-7: Penalties