§ 53.28 METERS; HOW PLACED.
   Wherever possible, meters shall be located on the outside of the building to be supplied with electrical current provided that the Superintendent of the Electrical System may permit the locating of the meters in other places when, in his or her opinion, such meter shall be safe from destructive conditions. The correct size of meter to be used on any service shall be determined by the Superintendent of the Electrical System. Meter location shall be the point of ownership.
(Prior Code, § 16-2-9)