1125.10 EROSION AND SEDIMENTATION CONTROL.
   Measures shall be taken to minimize erosion and its impact during subdivision construction activity consistent with the requirements of Chapter 1191. Detailed erosion control plans as described in 1191.21 shall be submitted with the improvement plans and shall indicate the techniques to be used both temporarily (during construction) and permanently, and include a schedule for implementing or installing same. All erosion control devices shall be in place at the start of construction and other measures implemented according to the approved time schedule.
   Erosion control plans shall be based upon controlling erosion on-site, with the object of eliminating or minimizing erosion or sedimentation impacts off-site. Techniques, devices, or measures used shall be as approved by the Village Engineer in consultation with the Madison County Soil and Water Conservation District based on the requirements of Chapter 1191.
(Ord. 06-08. Passed 2-25-08.)