9.17.1.20   Utilities
   (A)   The application for a preliminary subdivision plat must be accompanied by satisfactory evidence as to the adequacy of the proposed method and system of water supply and sanitary sewage collection and disposal and by a certificate of approval thereof by the Health Department or public utility provider. Public water and sewer shall be required where available in accordance with Section 9.9;
   (B)   In addition to the requirements of the Moore County Health Department and any State agencies regarding water and sewerage systems, all water and sewer mains shall be installed with the connections for individual service lines included, running from the mains to the property line of the property to be served, where said connections will run under the pavement and paved areas, they shall be installed prior to paving;
   (C)   Water mains and sanitary sewers shall be installed in accordance with State of North Carolina Standards and Village of Pinehurst Engineering Standards and Specifications Manual and public utility provider for each lot in the tract of land to be subdivided in whole or in part;
   (D)   Before installation, a complete set of construction plans for the proposed water and/or sewerage system prepared by a registered professional engineer shall be submitted for approval by the Village Engineer or public utility provider.
   (E)   The Village or public utility provider may require installation of oversized facilities when it is in the interest of future development of property not owned by the subdivider. The Village or public utility provider shall pay for that portion of the improvement that exceeds the typical Village or public utility provider standards if the oversized facilities are required for use of development of property other than that of the subdivider. Any payment by the Village or public utility provider shall be based upon costs pre-approved by the Village or public utility provider;
   (F)   All electrical, cable antennae, natural gas, telephone, and other service lines shall be installed underground in accordance with offsets and depth specified by the Village or public utility provider.