8.3.3.8   Street Construction
   (A)   All streets shall be designed in accordance with the Village of Pinehurst Engineering Standards and Specifications Manual;
   (B)   Notwithstanding any other requirements set forth elsewhere in this Ordinance, street construction projects located in the Watershed Protection District shall be constructed with curb and gutter according to Village of Pinehurst Engineering Standards and Specifications Manual; provided that such projects shall, to the maximum extent practicable, minimize built-upon surface area, direct storm water away from surface waters and incorporate Best Management Practices to minimize water quality impacts by:
      (1)   Installing outlets to convey all storm water to grass swales or vegetated areas meeting NCDENR design standards for Best Management Practices prior to the runoff discharging to waters;
      (2)   Obtaining from the Village Engineer approval for any site-specific proposal to minimize the impact of the proposed street on water quality in any site-specific area where option 1 cannot be practicably implemented. Any site-specific proposal to be employed in a water supply watershed area as part of this standard shall be accompanied by adequate computations and documentation to demonstrate that the proposal will provide at least eighty-five percent (85%) TSS removal in accordance with the design standards of the NCDWQ "BMP Design Manual".
(Ord. 14-35, passed 09-24-2014)