Before any regulated establishment may construct or enter into a contract for the construction or substantial alteration of any facility listed in Section 8.04.040 it must apply to the department for approval. The application must be submitted at least thirty days before the proposed start date of the project and be accompanied by the appropriate fee and the following:
A. Scaled drawings of the work to be done. Sufficient detail must be shown on the drawings to make clear to the department what work is to be done. All scaled drawings must be submitted electronically, with the exception of those for mobile food, limited manufacturing, and catered food sites;
B. Complete specifications to supplement the drawings;
C. Additional data as may be required by the health officer including a design report describing the project, the basis of design, together with design data and other pertinent information necessary to give a clear understanding of the work to be undertaken.
(Ord. 2016-12, § 1 (part), 2016)