A. Approval of Subdivision Required. Until a tentative plat and a final plat of a subdivision shall have been approved in accordance with this chapter and the Subdivision Development and Street Standards Manual, no person proposing a subdivision within Pima County, outside the corporate limits of any city or town shall:
1. Subdivide or file a record of survey, map or plat for record; or
2. Sell any part of said subdivision; or
3. Proceed with any grading, construction or other work on the same, except as specified in Section 18.69.060G.
B. Lots. All lots shall be consistent with the zoning requirements.
C. Except as otherwise provided herein, a subdivider shall construct or install all required subdivision improvements or provide assurances for their installation as defined in Section 18.69.070 prior to the issuance of a building permit for any lot.
(Ord. 2005-35 § 3 (part), 2005; Ord. 1997-68 § 1, 1997; Ord. 1985-82 (part), 1985)