17.20.080   Sampling and testing facilities.
   A.   For sampling, monitoring and testing required by the control officer pursuant to Section 17.20.010, the control officer may require the source operator to provide and maintain sampling and testing facilities. When requested in writing by the control officer, a source operator shall provide and maintain performance testing facilities and conditions as follows:
      1.   Sampling ports adequate for the applicable test method, including (if necessary) extensions of stacks needed for obtaining representative samples;
      2.   Sampling platforms and access thereto sufficient to assure sampling operator safety and the acquisition of representative samples;
      3.   Electrical power adequate to perform a test in accordance with the applicable method; and
      4.   Operation of the source during testing so that representative samples can be obtained.
   B.   If source operating conditions must be adjusted during a test, the control officer shall notify the source operator in writing at least ten days prior to the test.
(Ord. 1994-83 § 71, 1994: Ord. 1993-128 § 5 (part), 1993)