A. Water supply, water treatment, and sewage collection and disposal systems built in a regulatory floodplain or erosion hazard area shall be designed to prevent or minimize infiltration of flood waters into these systems and to prevent the discharge of materials from these systems into flood waters.
B. On-site sanitary waste disposal systems shall be located or designed to avoid impairment to them or contamination from them during flooding.
C. Other utilities, such as gas pipelines, fuel pipelines, and non-potable waterlines shall be designed and constructed to ensure they are not impaired during the base flood, including the potential for long term scour.
(Ord. 2010-FC5 § 1 (part), 2010; Ord. 2005 FC-2 § 2 (part), 2005; Ord. 1999 FC-1 § 1 (part), 1999; Ord. 1988 FC-2 Art. 9 (B) (4), 1988)