Certification of elevation shall be required to demonstrate compliance with regulatory flood elevation requirements for structures, manufactured homes, service facilities, or other improvements.
A. Prior to the pouring of the first slab for the finished floor, a certification of elevation of the form representing the top of slab shall be provided to the chief engineer.
B. Prior to final inspection, the applicant shall submit to the chief engineer a certification of elevation on a form approved by the district including but not limited to:
1. Elevation of the finished floor, and in the case of manufactured housing, elevation of the lowest structural member;
2. Elevation of the highest and lowest finished and natural grades adjacent to the structure;
3. Elevation of service facilities;
4. Flood venting information, if applicable; and
5. Other information as required on the certification of elevation and to demonstrate compliance with the provisions of the floodplain use permit.
C. Certifications of elevation shall be prepared and sealed by an Arizona registered land surveyor or Arizona registered civil engineer.
D. Such certifications of elevation shall be maintained by the floodplain administrator, as required by the Arizona Secretary of State, in the Floodplain Management Division of the District.
(Ord. 2010-FC5 § 1 (part), 2010; Ord. 2005 FC-2 § 2 (part), 2005; Ord. 1999 FC-1 § 1 (part), 1999; Ord. 1988 FC-2 Art. 7 (J), 1988)