(a) Unless otherwise approved by the Engineer, the street surface course shall be asphaltic concrete or concrete, and the street base course shall be aggregate, bituminous aggregate, concrete or asphaltic concrete.
(b) The subgrade and each material course shall be inspected and accepted before the next succeeding course is placed. If required by the Engineer, testing of the subgrade shall be done by the developer.
(Ord. 2014-27. Passed 8-5-14.)