1258.06   ADDITIONAL STREET IMPROVEMENTS.
   The reservation, dedication, improvement and/or construction of part or all of any street, intersection, alley or perimeter street, including traffic control signs and devices, may be required to minimize future hardship or expense to the public or abutting property owners. Funds in lieu of improvements may be considered or required. The developer shall submit a traffic study showing the impact on traffic created by the proposed development. The City Engineer shall review such traffic study to verify its validity, and make recommendations for road improvements that may be required as a result of, or to accommodate, the proposed development. The Engineer shall further estimate the cost of such improvements. Such estimate shall be used in determining the amount the developer must pay in lieu of construction of the required improvements.
(Ord. 2014-27. Passed 8-5-14.)