1254.11   CONSTRUCTION AND UTILITY PLANS.
   The subdivider, having received approval of the preliminary plat, shall submit the requisite number of copies of the proposed utility improvements along with the required storm and sanitary hydraulic calculations and exhibits to the Engineer in accordance with Engineering Department standards. Generally, the Engineer can be expected to require the extension of utility lines to one or more property lines of the subject site. The Engineer may approve or disapprove the plans. If approved, the Engineer shall require the original tracings. If disapproved, the subdivider shall make the necessary corrections and resubmit the plans to the Engineer.
(Ord. 2014-27. Passed 8-5-14.)