1214.03   CONSTRUCTION OF DRIVEWAY APPROACHES; FILING OF DOCUMENTS.
   (a)   No driveway approach shall be constructed so that any part of it extends in front of property belonging to a person other than the permittee, unless a joint application is signed by both parties to share a single cut at that location.
   (b)   Appropriate easements, surveys or other necessary legal documents shall be prepared and filed with the appropriate county prior to the final approval of the curb cut by the Engineer.
(Ord. 2014-27. Passed 8-5-14.)