1212.011   RIGHT-IN/RIGHT-OUT STANDARD DETAIL.
   The final design of the right-in/right-out is the responsibility of the developer and its engineer and must be approved by the City Engineer.
(Ord. 2014-27. Passed 8-5-14.)