(a) Each industrial plant, as defined in Section 1054.01(a)(24), shall construct and maintain in proper working order, at its own expense, monitoring facilities to allow inspection, sampling and flow measurement of the building sewer.
(b) The monitoring facilities may be either an opening to the sewer inside a structure or a manhole. The facilities shall be constructed on the user's premises, but when the location would be impractical or cause undue hardship on the user, the Manager may allow the facilities to be constructed in a public right of way. Ample room shall be provided at the facilities to allow for safe sampling. The facilities shall be constructed in accordance with Municipal requirements and meet all local agency construction standards and specifications. Unless a time extension is granted, the construction of the facilities shall be completed within ninety calendar days after written notice from the Manager.
(c) Municipal personnel shall have access to the monitoring facilities at all times for inspection and collection of samples. If the facilities are locked, special arrangements shall be made to allow access. The Municipality shall also have the right to set up monitoring devices at the facilities.
(Ord. 2000-40. Passed 6-6-00.)