(a) Where there is a disagreement over the exact location of the boundaries of the Flood Plain District, the Board of Zoning Appeals shall direct the person questioning the boundary location, to retain, at their own expense, a registered surveyor or professional engineer to undertake a flood hazard study to determine the point of land which corresponds to the profile for the 100 year flood.
(b) If a person desires to utilize the land as permitted by the District with which the Flood Plain District is combined, but such utilization is not permitted or conditionally permitted in the Flood Plain District, and it can be shown that such use will not increase flood stages during the 100 year flood or be subject to physical harm, such use may be permitted. Field survey costs and engineering consultant costs must be paid by the persons proposing the special use.
(Ord. 717. Passed 7-10-89.)